Meter Replacement Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The Town of Breckenridge is excited to share that we are upgrading our water metering system to Advanced Metering Infrastructure (AMI) technology. This upgrade will allow for more accurate metering, early leak detection, and the ability for customers to view daily usage. The project is partially funded by a grant from the Department of Local Affairs (DOLA) and will improve the overall efficiency of the water system and reduce water system losses. 

To schedule your appointment please contact DB Utility directly using one of the following options:

(303) 900-8602

https://tobcoappt.fieldmanagementsystems.com/

Why is my water meter reading technology being replaced?
Where is my water meter located?
Does my water meter reading technology have to be exchanged?
Do installers need to come inside my house?
Who will install the new meter/ How will I be able to identify authorized contractors?
Do I have to be present for the installation?
What exactly will be installed at my property?
Do the new meters have any other benefits for me?
What if I am a tenant and do not own this property?
My home is a second residence; is a door hanger necessary?
When will the new water meter be installed in my home?
How long does it take to install the water meter reading technology?
Will my water service be interrupted during the installation?
Is there anything I need to do?
How much room do installers need?
Can I cover up my meter after the installation?
How much will the new meter cost me/ Will I pay more with the new meter?
What if there is a leak at the meter or any other issue after the meter is replaced?
Is there any special care or maintenance that I need to do to my new meter?
How do I sign up for Watersmart?
Is the new meter environmentally friendly? What happens to the current meters?