Planning
Our office is located on the second floor of Town Hall at 150 Ski Hill Road in Breckenridge. Normal business hours are Monday-Thursday from 8am-5pm, and Fridays from 8am-12pm. We are closed on major holidays. We can be reached at 970-453-3160 or via email at websitecommdev@townofbreckenridge.com.
To reach a specific staff member, you can utilize our staff directory or call the main line at 970-453-3160.
Popular Topics
Recent Code Changes
Neighborhood Preservation Policy: The Town of Breckenridge values the diversity of homes throughout its neighborhoods, including diversity in home size, type, and architecture. The variety of different types of homes reflect the deep and colorful history of Breckenridge, from its small mining town roots through its evolution to a world-class resort destination. Recent trends of demolishing existing homes and replacing them with large residences that dominate the viewshed compromise the character of our town and neighborhoods and do not align with multiple Town goals and community values, including Community Character, Natural Resources, the Built Environment and Sustainability.
Staff have been directed by Town Council to focus on the following Development Code policies:
- Setbacks – consideration to require greater distances between homes and greater distances from rights-of-way
- Building Height - 35’ maximum building height to remain but establish a maximum percentage of ridges that can be within a certain amount of feet of 35’
- Elimination of Positive Points for Electric Vehicle Chargers & Landscaping for single-family home projects
- Additional density or square footage restrictions are not recommended by Town Council
Community Development held work sessions with local building and architecture professionals and general open houses on March 6, May 21, and June 25, 2025 to gain community feedback on the proposed policy changes.
You can view the NPP open house presentation here.
Recently codified in October, Ordianance 13 amended Policies 9R, 22R, and 33R to remove relative setbacks for single family residences, modify positive point requirements for installing EV chargers, and remove single family and duplex residences from being eligible for positive points for landscaping. This was the first phase of several in our Neighborhood Preservation Policy code updates.
For more information please reach out to Chris Kulick via email at chrisk@townofbreckenridge.com or via phone at 970-453-3371.
Pending Projects
Breckenridge Grand Vacations, Parcel 6 Subdivision: An application has been submitted by Breckenridge Grand Vacations to subdivide Parcel 6 (a property adjacent to the ski area and Timber Trail Subdivision). The proposed subdivision follows the April 9, 2024 development agreement between the Town and BGV which allows for up to 14 single-family home lots.
Entrada Workforce Housing (11030 CO State Highway 9): The applicant, Breckenridge Grand Vacations, proposes constructing 40 deed-restricted, one-bedroom, workforce housing units in one building at the northeast corner of CO Highway 9 and Huron Road with access off Highway 9. This project will serve as the required employee housing mitigation for the Imperial Hotel development on Peak 8. A first hearing for the project was held February 4, 2025 and the project is still under review.
Frith Single-Family Residence (110 S High Street): The applicant proposes construction of a new two-story, 1,100 sq. ft. single family residence with 1 bedroom, 1 bath, and 2-car garage. The home is proposed with traditional architectural features including a gable roof, dormer windows, lap siding, and stone accents. The property is within the Local Historic District and will be evaluated against the Town’s Handbook of Design Standards for the Historic and Conservation Districts. A preliminary hearing for the project was held September 17, 2024.
South Gold Rush Lot (Parcel 3) Duplexes Modification (355 N Park Avenue): Breckenridge Grand Vacations submitted a modified site plan to construct 8 duplex structures with 16 residential units. The modification affects Phase II of the project. The project is proposed to have 57,589 square feet of total floor area with contemporary mountain architectural design style and finishes. Five buildings are to be accessed from an interior private drive and three buildings will be accessed from Woods Drive. The development is subject to the approved development agreement between the Town of Breckenridge and Breckenridge Grand Vacations and the amended Gondola Lot Master Plan. The modified project was approved by the Planning Commission June 17, 2025. Phase I of the project is currently under construction. A future roundabout at Park Avenue and French Street will be separately reviewed and approved.
Recently Approved Projects
Driving Range Netting Town Project (200 Clubhouse Drive): A proposal to install 30 ft. tall netting along the west side of the golf course driving range and 20 ft. tall netting along the north end of the golf course driving range. The project was approved by Town Council March 25, 2025.
Imperial Hotel and Private Residences (1599 Ski Hill Road): This Breckenridge Grand Vacations project proposes to construct a mixed-use hotel, condominium, townhome, and commercial development at the base of Peak 8 as part of the April 9, 2024 development agreement between the Town and BGV. The project will consist of 36 hotel units, 59 condominium units with 76 lock-offs (23 whole ownership with 22 lock-offs and 36 fractional ownership with 54 lock-offs), and 9 townhome units. The project will include guest resort amenities and commercial areas such as a market, restaurant, bars, commercial kitchen, pools and spas, arcade, theaters, etc. Space is also allocated to provide administrative offices for Vail Summit Resorts, Inc. (VSRI) and program area for the Breckenridge Outdoor Education Center (BOEC). Parking will be in an underground garage. Town Council approved the project May 13, 2025 which included a variance to complete required drainage infrastructure improvements to maintain water quality within the Cucumber Gulch Preserve and Preventative Management Area (PMA).
Runway Master Plan (51 Faction Road): This master plan outlines a proposed for-sale workforce housing development, Runway Neighborhood, located on 24 acres of vacant Town owned land off Airport Road. The plan proposes a diverse mix of 148 workforce housing units, including single-family, cottage, duplex, and townhome units, as well as community gathering spaces and access to the Blue River Rec Path. The Master Plan was adopted by Town Council on May 13, 2025.
North Gold Rush Lot Parcel 2 Workforce Housing (415 N Park Avenue): Breckenridge Grand Vacations proposes to develop a single apartment building with eight 6-bedroom employee units on the North Gold Rush Lot. This development was contemplated in the April 9, 2024 development agreement between the Town and BGV. The proposal includes a single building with parking underneath and improvements to the existing overflow skier parking lot. The project was approved by Town Council April 8, 2025.
Highlands Riverfront Tract E Condos (13545 CO Hwy 9): This Breckenridge Lands project proposes to construct 44 workforce housing units in four condominium buildings on Highlands Riverfront Tract E, accessed from Stan Miller Drive. The four buildings are designed in a contemporary mountain architectural style. Each building will be three stories overall, stepping down to two stories at the edges. The entirety of the project is intended to be deed-restricted for-sale units. The project will provide 67 surface parking spaces and pedestrian connections to existing recreation paths and open space. An existing 2,344 sq. ft. professional office building is located on the southeast corner of the lot and is proposed for demolition with this project. The project was approved by Town Council August 27, 2024 and is currently under construction.
Breckenridge Grand Vacations, Peak 7 & 8 Master Plan Amendment (1599 Ski Hill Road, County Road 3, County Road 709, County Road 710, Timber Trail Road): This Master Plan amendment updated the allowed land uses and created two new planning areas, G & H, for residential uses. The amendment also transferred 90.2 additional SFEs of density, from the Gondola Lot Master Plan area to the Peak 7 & 8 Master Plan and modified the Parking and Traffic Requirements, Heights of Buildings, Development Plan Concept, and Vesting sections of the Master Plan in accordance with the approved April 9, 2024 Breckenridge Grand Vacations Development Agreement. This amendment was approved on August 13, 2024.
Breckenridge Grand Vacations, Gondola Lot Master Plan Amendment (350, 355, 415 North Park Avenue): This amendment updated the master plan for the North Gondola Lot, North Gold Rush Lot and South Gold Rush Lot and transferred 90.2 SFES of density from the Gondola Lots to the Peak 7 & 8 Master Plan area (Parcels 4, 5, & 6) and Entrada Lot (Parcel 7). The Gondola Lot Master Plan area will also receive up to 13.9 SFEs of density from the Town of Breckenridge for the construction of workforce housing apartments on North Gold Rush Lot (Parcel 2). This amendment was completed in accordance with the approved April 9, 2024 Breckenridge Grand Vacations Development Agreement. This amendment was approved on June 11, 2024.
Cammett House Historic Restoration, Addition, and ADU (203 S French Street): A proposal to construct a 186 SF addition to the rear of the primary historic residence, complete an exterior rehabilitation, full interior remodel, and basement addition. The project will also include exterior rehabilitation and adaptive reuse of the historic garage into a deed-restricted accessory dwelling unit with full interior remodel and basement addition. The new ADU will provide a workforce housing unit. The historic residence and historic garage will both be locally landmarked through this project. This project was approved on June 25, 2024 and is currently under construction.
Breckenridge Grand Vacations Peak 8/ Gold Rush Lot Development Agreement (350, 355, 415 North Park Avenue; 1599 Ski Hill Road; 550 Four O’clock Run Road; 11030 Colorado Highway 9): A Development Agreement between the Town of Breckenridge and Gondola Properties, LLC, etc. was approved on April 9, 2024. The Development Agreement provides a prescription for development on seven different parcels identified below in exchange for increased employee housing beyond what is required by Code, a $2 million contribution to the Sol Center, Cucumber Gulch improvements and minimizing development in the core of Town.
- Parcel 1(North Gondola Lot): 0.0 SFEs – Skier parking
- Parcel 2 (North Gold Rush Lot: Up to 21.7 SFEs – Employee housing and skier parking
- Parcel 3 (South Gold Rush Lot): Up to 30.0 SFEs – 16 market-rate duplex units
- Parcel 4 (Peak 8 Admin Site): Up to 220.0 SFEs – Hotel and Condominium Building
- Parcel 5 (Adjacent to Four O’ clock Subdivision): Up to 2.0 SFEs – two market-rate single-family homes.
- Parcel 6 (Adjacent to Timber Trail Subdivision): Up to 14.0 SFEs - 14 market-rate single-family homes.
- Parcel 7 (Entrada Site): Up to 29.2 SFEs – Workforce Housing
Main Street New Construction (114 South Main Street): A proposal to construct a new two-story building of 5,640 sq. ft., containing commercial retail and restaurant uses. This application proposes 4,451 sq. ft. of commercial retail, 649 sq. ft. of retail food and beverage (bar) area, and 1,270 sq. ft. of exterior food and beverage area on a roof top deck. The proposed building shows a recessed entrance store-front design, with storefront windows, steel kick plate and a wood trim belt course above transom windows on the lower level, a design typical of commercial buildings in the historic district. The project was approved by Town Council November 14, 2023.
Breckenridge Ski Resort Master Sign Plan: The proposed Master Sign Plan will serve as the primary document regulating property signage and will provide an organizational framework that is tailored to the resort and the activities that occur through various seasons. The Master Sign was approved at a De Novo Hearing in front of the Town Council on November 8, 2022.
Stables Village Master Plan (710 Wellington Road): This master plan defines a new for-sale workforce housing development, Stables Village, located on 8.4 acres of the Stillson Patch Placer. The plan proposes 61 workforce housing units, including 5 single-family units, 38 duplex units, and 18 triplex units. The remainder of the Stillson Patch Placer tract, 30.47 acres, will remain allocated to governmental uses, such as open space, recreation, public works storage, snow storage, and solar energy production. The Master Plan was adopted by Town Council on April 11, 2023 and Phase I of the homes have been completed. Phase II is currently under construction.
Sol Center at Alta Verde (Family and Intercultural Resource Center-FIRC): A proposal to construct a new 18,150 sq. ft. containing a non-profit thrift store, food bank and non-profit offices for FIRC and Building Hope. The project will provide 44 parking spaces, a separate loading area for larger trucks, and new sidewalks. This project was approved at a Town Project Hearing on July 5, 2022 and is currently under construction.